Prefab · Buyer Representation
The modular home industry is complicated.
Your purchase doesn't have to be.
Average client savings vs. going direct to manufacturer
Median days from signed contract to delivery on site
Factory partners vetted, audited, and approved
No obligation · 30-minute call · 23 vetted factory partners
Factory → Flatbed → Your Lot · The entire journey, already mapped.
Interactive Explorer · 01
Match the right floor plan
to your actual lot.
Not every floor plan works on every lot. Toggle between three factory-certified designs and three real lot types to see what your agent evaluates before you spend a dollar.
Select Floor Plan
The Meridian · 1,890 sq ft · 3BR/2BA
Select Lot Type

Site prep: Tree clearing, septic, well required.
Your agent has navigated this combination 7× in the last 18 months.
Interactive Explorer · 02
Watch months collapse
into weeks.
Drag the slider to advance through the calendar. See exactly where a modular build finishes while traditional construction is still framing walls.
MODULAR BUILD
16 weeks total
STICK-BUILT
43 weeks total
Interactive Explorer · 03
Every dollar, explained
before you spend one.
Click any line item to expand the detail. This is the cost anatomy your agent reviews with every client before a single manufacturer quote is requested.
Total Project Range
All-in, site to move-in. Varies by lot type, location, and finish level.
Cost Composition
The manufactured home itself, including all interior finishes, cabinets, and HVAC.
Varies by sq ft, manufacturer, and finish tier.
Fireplace, upgraded kitchen, energy package, exterior finishes.
Everything that happens before the home arrives: clearing, grading, and foundation.
Wooded lots cost significantly more than clear rural land.
Crawlspace, slab, or full basement. Soil conditions drive cost.
Flatbed hauling from factory to your lot, plus crane for multi-module set.
Per module, per 100-mile radius. Escort vehicles add cost.
Single-wide needs no crane. Double-wide and multi-module require it.
Connecting the home to water, sewer/septic, electric, and gas.
Required for most rural lots. Perc test results drive design.
Utility drop, meter base, and well drilling if no municipal water.
Buyer's agent fee is typically paid by the manufacturer or seller — not you.
Prefab fees are paid by the manufacturer in 19 of 23 factory partnerships.
Not ready to call yet?
Download the Modular Buyer's Checklist — 47 questions to ask before signing with any manufacturer.
Client Outcomes
Three clients.
Three very different lots.
Every project is different. Every outcome is documented. These are real numbers from the last eighteen months.
We'd spent four months emailing manufacturers directly and getting nowhere. Prefab had a shortlist of three vetted factories and a site-prep contractor on our lot within eleven days. We closed in ninety-four.
I'm a retired civil engineer. I thought I could navigate this myself. The transport permitting alone — oversize load, county escort, bridge weight limits — would have taken me months to figure out. My agent handled it in a week.
Stick-built was $390k and eighteen months out. Prefab found us a factory partner doing a farmhouse model at $248k, delivered in fourteen weeks. We moved in before our lease was up.
Factory Partners · 23 Vetted & Approved
Book Your Strategy Call
Thirty minutes.
Every question answered.
Your strategy call is a working session, not a sales call. You'll leave with a shortlist of factory matches, a realistic site-prep budget for your lot, and a delivery timeline you can take to a lender.
Where are you in the process?
This helps your agent prepare the right materials.